Operations

Running the operation behind the program

Operations work covers the part of an aerospace and defense business that decides whether the program it won is the program it delivers: how the work is planned and paced, how material is bought and arrives, how the functions hand work to one another, and how cost and schedule hold when the contract outgrows the way the company was built.

It is run by people who have carried operating responsibility for the result rather than advised on it from outside, which is the difference a client tends to notice in the first week.

Where the work usually starts

Operations engagements usually begin after a win rather than a loss, and the symptoms rarely point at the cause: schedule slips look like supplier problems, margin erosion looks like a pricing problem and turnover looks like a hiring problem, when underneath all three is an operation that was never designed for the volume, the regulatory regime or the customer it now has.

Discovery icon: radar sweep with plotted contacts

Growth that outran the operation

A contract larger than anything the company has built before arrives, and the instincts of a few experienced people that ran the old volume start producing late parts, overtime and surprise costs at the new one.

Supply chain and procurement icon: three-tier node network

An acquisition on top of the existing base

Two supply bases, two sets of procedures and two customer lists have to run as one operation, usually while both are still delivering, and usually with compliance gaps the diligence never priced.

Plan icon: blueprint frame with a plotted node-to-node path

A function nobody formally built

Procurement, contracts or production control has been done by whoever had time, which works until an auditor, a prime or a larger customer asks to see how it is actually run.

What the work covers

1. Operating model and cadence. The rhythm the business runs on, from planning and review to escalation and decision rights, written down so the operation does not depend on who happens to be in the building, and measured against the handful of numbers that actually predict a late delivery.

2. Supply base and buying plan. A plan for every part, a supplier base sized to the work, long-term agreements where the volume justifies them, and a buying sequence that protects schedule on the long-lead items before it chases price on the rest.

3. Cost and schedule discipline. Operating plans, budgets and forecasts built so that a variance shows up in the month it happens, with every cost driver named and owned rather than discovered at the close.

4. Standing up a function. Procurement, contracts, production control or program management built from nothing, covering process, systems, people and the first ninety days of running it, for a company that has outgrown doing them informally.

5. Scaling after a large award. Headcount, facilities, supply chain and cash planned against the new contract’s delivery profile, so that growth arrives as capacity rather than as overtime.

6. Integration after an acquisition. An acquired operation and its supply base brought onto one system, the compliance gaps that came with it closed, and both customer sets kept delivering while it happens.

How an engagement runs

Operations work follows the same six steps as every engagement, with discovery weighted toward the data the operation already produces — the master schedule, open orders, supplier delivery history, the cost reports and the organization chart as it is actually staffed — and delivery done alongside the people who run the operation day to day rather than around them. The engagement ends when the cadence runs without us in the room, and the client is holding:

Where the method was proven

The method was built in operating seats where the result was measured rather than graded:

  • Lead times on flight-qualified hardware came down from years to months.
  • Nonconformance fell and on-time delivery rose across a supplier base of hundreds of companies.
  • A business unit’s revenue more than tripled while gross margin and cash reserves rose with it.
  • A workforce more than tripled in size while attrition stayed low.
  • A federal Contractor Purchasing System Review closed with no findings and no observations.

From the client record: turning a raw bill of materials into a buying plan for a contract manufacturer carrying a far larger commercial contract than it had built before.

Bring the operation as it runs today

The first conversation is a working session rather than a pitch, so bring the schedule that is slipping, the contract that outgrew the company or the acquisition that just closed, and you will leave with a straight answer on whether this is work we can help with.